How quality is held
Digital design with thickness and contact control. Milling and sintering to the material protocol. Hand finishing and verification on the model / articulator. Photo-check of critical zones before packing.
How timelines are held
The date is locked at intake. If data is missing, the case does not sit in silence — you get a list of what to send. If the date moves, the message goes out the day it becomes clear — not the night before try-in.
Turnaround
Times depend on the restoration type, the completeness of the Rx, and current load. The exact date is set on the case. Rush slots exist by agreement — they do not replace the standard.